Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
CGI Home Additions & ADU: The Redwood City Owner’s Guide
CGI home additions and ADU components in Redwood City typically run $45,000-$130,000 installed, depending on whether you’re extending an existing structure or building a detached unit from the slab up. We stock CGI-compatible framing hardware, window systems, and exterior finishes for same-day assessment, and we carry KraftMaid and Cambria lines for the interior fit-out. Most Redwood City owners first notice trouble when a CGI addition starts showing water intrusion at the tie-in point, or when the ADU’s prefab panel seams gap during our dry summers and wet winters.
Which CGI Models This Applies To
CGI builds three main product tiers: the Classic Series (stick-framed additions with site-built tie-ins), the Precision Series (panelized wall systems with factory-sealed joints), and the Haven Series (modular ADU units delivered in 8-14 foot sections). The Classic uses standard dimensional lumber with CGI’s proprietary header brackets - you’ll find the model stamp on a metal tag inside the utility chase, usually near the electrical panel. Precision units carry a QR code on the exterior sheathing, typically behind the downspout on the street-facing wall. Haven modular units have a serial plate on the mechanical closet door.
For replacement parts, the Classic Series accepts standard Simpson Strong-Tie hardware with no modification. Precision panels require CGI’s own gasket-and-track system; aftermarket gaskets exist from Tremco and Dow, but the interlock geometry differs by 3/16 inch, which is enough to break the rainscreen in a driving Peninsula storm. Haven modular units need factory-ordered splice plates for any structural connection. We keep Classic hardware and Precision gaskets on our Redwood City truck; Haven plates ship from CGI’s Sacramento warehouse in 48 hours.
We’re an independent service provider - not affiliated with CGI - and we source through the same distributors that supply their warranty crews.
Signs Your CGI Home Additions & ADU Is Failing

- Water staining at the original wall tie-in. The flashing detail between your existing home and the CGI addition carries lateral movement that caulk alone can’t absorb. In Redwood City’s clay-heavy soils, seasonal settling cracks the sealant bead and water tracks along the top plate.
- Panel seams visible from the curb. Precision Series gaskets compress permanently after 8-12 years of UV exposure. Once you can see daylight through a seam, the rainscreen is compromised and the OSB sheathing behind it is taking moisture.
- Doors or windows that stick seasonally. CGI units use engineered headers that perform best within a 1/4-inch tolerance. If the foundation has settled or the sill plate has twisted - common in the Stambaugh-Heller neighborhood’s older lots with irregular drainage - the frame goes out of square and binds the operable units.
- Musty odor in the mechanical chase. Haven Series units route HVAC and plumbing through a central chase that shares walls with the exterior envelope. A failed chase seal lets attic air into the conditioned space, and Redwood City’s marine layer humidity feeds mold in 72 hours.
- Exterior trim pulling away at corners. CGI’s PVC trim expands at 3.5 times the rate of the fiber-cement siding it butts against. Without the correct slip-joint detail, the trim buckles and opens a path for carpenter ants, which we see regularly in the hills above Farm Hill Boulevard.
Before
AfterReplacement Cost & What’s Included
| Service | Redwood City Price Range | What’s Included |
|---|---|---|
| CGI Home Addition (new build) | $45,000-$130,000 | Foundation, framing, roofing tie-in, electrical subpanel, rough plumbing, weather barrier, inspection coordination |
| CGI ADU Construction | $90,000-$220,000 | Detached unit, slab or stem wall, full MEP, kitchenette rough-in, separate meter if required |
| Panel gasket replacement (Precision Series) | $2,800-$5,500 | Removal of siding course, gasket extraction, new OEM or Tremco equivalent, re-flash, siding replacement |
| Tie-in re-flash and seal | $1,800-$4,200 | Cut back stucco or siding, install new pan flashing, flexible membrane, integrate with existing weather barrier |
| Foundation leveling and sill repair | $3,500-$8,000 | Jack and shim, sister joists if needed, replace rotted sill, termite treatment documentation |
The wide range on full additions reflects three variables: whether we’re tying into slab-on-grade or raised foundation, whether Redwood City requires a full fire separation for the ADU, and how far we need to extend electrical service from the main panel. Every quote is flat-priced with a written scope before work starts - no call-for-pricing, no allowance games. Under Clause 1 of The Haven Standard, the number you sign is the number you pay, and any change needs your signature before we touch a tool.
DIY or Call Us?

There’s a safe middle ground here. A homeowner can walk the perimeter with a flashlight, look for the symptoms above, and photograph anything suspicious - that documentation helps us enormously and costs you nothing. You can also check the CGI model tag and confirm whether your unit is still under factory warranty; CGI covers gasket defects for 10 years and structural connections for 20, but they require annual inspection records that most owners don’t keep.
Where DIY goes wrong is the tie-in work. The flashing between your existing home and the CGI addition is a life-safety detail: if water gets in and rots the sill plate, you’re looking at structural repair, not maintenance. The panel gaskets on Precision units are under compression tension when installed; removing them without supporting the panel above can distort the frame. And any electrical extension to service an ADU requires a Redwood City permit and inspection - unpermitted work kills resale value and insurance coverage.
We don’t charge to look. Call (650) 560-7228, we’ll schedule a documented site visit, and you’ll get a written price before any work starts.
FAQs
With proper maintenance, 40-50 years for the structure, 10-15 years for the exterior sealant systems before refresh. The marine layer accelerates gasket fatigue by roughly 20% compared to inland California, so we recommend inspection every 18 months rather than the factory’s 24-month guideline. Call (650) 560-7228 to schedule - estimates are free.
Gaskets and sealants: no, once the elastomer hardens or the bond line cracks, the material is spent. Structural connections: sometimes, if the bracket is sound and only the fasteners have corroded - Redwood City’s older lots near the creek zones see more fastener corrosion from soil moisture. We assess and document with photos before recommending either path. Call (650) 560-7228 for an exact quote - estimates are free.
4-6 months from permit to final inspection in Redwood City, assuming no utility delays. The city has a streamlined ADU program, but PG&E service extensions for separate meters currently run 8-12 weeks. We build that wait into the schedule so you’re not paying crew standby time. Call (650) 560-7228 to review timeline specifics for your property - estimates are free.
Classic Series hardware and Precision Series gaskets, yes - enough to stabilize most jobs same-day. Haven Series splice plates and factory window units ship from Sacramento in 48 hours. We also stock KraftMaid cabinet hardware and Cambria seam adhesive for the interior phase, so we’re not waiting on multiple vendors. Call (650) 560-7228 to confirm availability for your CGI model - estimates are free.
Grant Rowan keeps a running list of every CGI job where the tie-in detail surprised us - wrong soil report, hidden chimney flue, PG&E trenching conflict - and what we changed in the pre-construction checklist the next time. That list is why our projects finish within a few percent of the written price. Measure twice, document once, build it so it doesn’t come back.
Ready to price your CGI home addition or ADU repair in Redwood City? Call (650) 560-7228 to schedule your free estimate. We’ll deliver a flat written price with a detailed scope before any work starts, and every visit includes a documented photo record you’ll keep. That’s Clause 1 of The Haven Standard, and it’s how we’ve operated since 2007.
Written by Grant Rowan, Owner, Rowan Construction Group Redwood City at Rowan Construction Group Redwood City, serving Redwood City and nearby areas.







Before
After
Before
After
Before
After