Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Jerith Home Additions & ADU: The Redwood City Owner’s Guide
Jerith-compatible home additions and ADU components installed in Redwood City typically run $45,000-$130,000 depending on whether you’re extending an existing structure or building a detached unit from the slab up. We stock Jerith aluminum framing systems, panel connectors, and weather-seal kits on our Redwood City trucks, and we can usually source same-day what we don’t carry. Most owners realize something’s wrong when the addition’s thermal expansion joints start separating, the panel gaskets harden in the Peninsula’s salt air, or the original Jerith fasteners corrode after a decade of marine-layer mornings.
Which Jerith Models This Applies To
Jerith’s residential line breaks into three series that matter for Redwood City additions: the 200 Series (light-duty porch enclosures, 1980s through early 2000s), the 400 Series (mid-weight sunroom framing still common in Woodside Plaza rebuilds), and the 600 Series (structural-grade aluminum used for ADU walls and roof transitions since about 2012). The part number is stamped on the inside face of the vertical mullion, usually a 6- or 8-digit code ending in -200, -400, or -600. If the stamp’s corroded, measure the mullion depth: 2 inches for 200 Series, 2.5 inches for 400, 3 inches for 600. The 400 and 600 Series share some gasket profiles but not structural clips, which is the compatibility gotcha we see most often in Redwood City - a 400 clip on a 600 mullion will seat but won’t carry load.
Jerith OEM parts ship from their Pennsylvania facility in 5-7 business days. We keep aftermarket equivalents from C.R. Laurence and Tubelite in stock for the 400 and 600 Series, tested to match Jerith’s 0.080-inch wall thickness and 6063-T6 alloy spec. For 200 Series repairs, we generally recommend upgrading to 400 Series mullions if the structure supports it - the 200 Series was discontinued in 2008 and aftermarket availability is thinning.
Signs Your Jerith Home Additions & ADU Is Failing

- Visible gaps at panel corners. The EPDM gasket has shrunk or the spline has backed out. In Redwood City’s climate, gaskets typically harden in 8-12 years versus the 15-year rating, because the marine layer keeps surface moisture high even when rainfall is low.
- Condensation between glass and frame. The thermal break has separated or the weep holes are blocked. Jerith’s early thermal-break adhesive (pre-2015) degrades faster in high-UV, high-humidity zones like the lower Peninsula.
- Frame racking or door misalignment. The sill anchor has corroded or the jamb clip has fatigued. Redwood City’s older neighborhoods, including Stambaugh-Heller, often have additions built on perimeter foundations that settle differentially, stressing the aluminum frame.
- White powder on frame surfaces. Galvanic corrosion between the aluminum and a dissimilar-metal fastener. Jerith specified stainless fasteners after 2010; earlier jobs used zinc-plated steel that fails predictably in salt air.
- Roof panel sag or water staining at the header. The structural gutter has deflected or the condensation channel is blocked. On Jerith roof systems, the gutter doubles as the load path - once it holds water, the 600 Series header can creep downward 1/8 inch per year.
Before
AfterReplacement Cost & What’s Included
For a Jerith home addition or ADU repair in Redwood City, expect $45,000-$130,000 for full structure replacement, or $3,500-$12,000 for component-level repair (gasket replacement, mullion swap, or roof panel reset). The low end covers a 200 Series porch enclosure refresh with aftermarket gaskets and clip replacement; the high end covers a 600 Series detached ADU with engineered footings, Title 24 energy compliance, and full permit coordination through San Mateo County.
Our quotes itemize parts, labor, and permit fees separately. Under Clause 1 of the Haven Standard, the written price is delivered before any work starts - no exceptions. Every Jerith repair carries our 365-Day Done Right Promise: if the gasket leaks or the frame shifts, we return and make it right. The documented photo record from your job goes to you by text link before we leave the site.
| Scope | Price Range | Typical Timeline |
|---|---|---|
| Gasket and seal replacement, 200/400 Series | $3,500-$6,500 | 1-2 days |
| Mullion and clip repair, 600 Series | $6,500-$12,000 | 2-3 days |
| Partial wall/roof panel replacement | $15,000-$35,000 | 1-2 weeks |
| Full ADU structure, Jerith-compatible system | $90,000-$220,000 | 8-14 weeks |
DIY or Call Us?

You can safely inspect your Jerith system with a flashlight and a 6-foot level. Check the mullion stamp, look for standing water in the gutter track, and verify that doors operate without binding. What you should not do: remove a load-bearing mullion, cut into the roof panel seal, or attempt to reset a sagging header. The 600 Series header carries 40 pounds per linear foot in a typical Redwood City wind load - releasing it without temporary shoring can drop the roof panel. We carry the shoring, the mullion puller, and the torque-limited fasteners on every truck. If you’ve found the part number and want to know whether we have it in Redwood City, call (650) 560-7228 and we’ll check stock while you’re on the line.
FAQs
EPDM gaskets in Redwood City typically fail at 8-12 years, sooner than the manufacturer’s 15-year rating, because the marine layer maintains surface moisture even in dry months. We use silicone-enhanced replacements rated for 20 years in coastal zones. Call (650) 560-7228 for an exact quote - estimates are free.
Yes, if the corrosion is surface-only and the alloy hasn’t pitted through. We sand, treat, and recoat localized corrosion on 600 Series mullions; if the wall thickness has dropped below 0.060 inch, replacement is the only safe option. Call (650) 560-7228 for an exact quote - estimates are free.
A single mullion swap on a 400 or 600 Series frame takes 4-6 hours if we have the part; a full gasket replacement on a 12-by-16-foot addition takes 1-2 days. We stock 400 and 600 Series mullions and clips on our Redwood City trucks. Call (650) 560-7228 for an exact quote - estimates are free.
We stock Jerith-compatible 400 and 600 Series mullions, clips, gaskets, and sealant on our Redwood City trucks. OEM Jerith parts ship in 5-7 days; we use them only when the project requires exact color match to existing anodizing. Call (650) 560-7228 for an exact quote - estimates are free.
Rowan Construction Group Redwood City is an independent service provider and is not affiliated with Jerith. We also stock and install parts for KraftMaid, Cambria, and Silestone systems.
Measure twice, document once, build it so it doesn’t come back. That’s how we’ve kept projects within a few percent of the written price across 4,000-plus jobs since 2007.
Call (650) 560-7228 to schedule your free estimate. Grant Rowan or a member of our team will review your Jerith system, deliver a written line-item price before any work starts, and put the 365-Day Done Right Promise in writing.
Written by Grant Rowan, Owner, Rowan Construction Group Redwood City at Rowan Construction Group Redwood City, serving Redwood City and nearby areas.







Before
After
Before
After
Before
After