Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
KraftMaid Home Additions & ADU: The Redwood City Owner’s Guide
KraftMaid cabinet systems in Redwood City home additions and ADUs typically run $45,000-$130,000 installed, depending on whether you’re extending an existing kitchen into a new great room or building a standalone accessory dwelling unit with full cooking facilities. We stock and install KraftMaid-compatible cabinet configurations, hardware, and finishing systems for both attached home additions and detached ADU projects across the Peninsula. Most KraftMaid orders for Redwood City properties arrive within 3-4 weeks from the Ohio factory, with rush options available for time-sensitive permits.
Most Redwood City owners discover their KraftMaid system needs attention during the planning phase, not after installation. A failed or mismatched cabinet specification - wrong depth for an ADU’s compact footprint, incompatible door style for a historic district overlay, or a discontinued finish that no longer matches the main house - kills permit approvals and delays framing. In the Stambaugh-Heller neighborhood, we’ve seen owners order standard 24-inch base depths only to learn their ADU’s plumbing chase demands 21-inch customs. The symptom is usually a stop-work order, not a broken hinge.
Which KraftMaid Models This Applies To
KraftMaid organizes its product lines by construction type and price tier, and the right choice for a Redwood City addition or ADU depends on permit requirements and how the space connects to your main residence.
All-Plywood Construction (APC) is what we specify for most ADUs and additions in Redwood City. The box is 3/8-inch plywood, not particleboard, which matters in the Peninsula’s marine climate where winter humidity swings hit 30-plus points between October and April. APC carries a limited lifetime warranty and accepts any KraftMaid door style.
Vantage (particleboard core) is factory-direct only and costs less, but we don’t recommend it for ADUs. The moisture resistance isn’t there, and Redwood City’s proximity to the bay means fog-layer condensation in unconditioned spaces during construction.
Door style compatibility: Most KraftMaid door styles work across both construction types, but the Square Recessed Panel and Arch Raised Panel lines are what we see specified for craftsman-era homes in the Mt. Carmel and Friendly Acres areas. If your main house runs Canvas or Dove White painted finishes, the ADU must match exactly - KraftMaid’s painted whites shifted slightly in 2019, and the old formula is gone. We keep sample chips from both eras on our truck.
To identify your existing KraftMaid cabinets, check the hinge cup bore: a 35mm cup with two 8mm mounting holes at 48mm centers is standard post-2000. The interior label, usually on the back of a drawer front or inside a wall cabinet, lists a six-digit model code, finish number, and plant code (MX for Middlefield, Ohio). Bring that label or a photo to your estimate - we cross-reference it against KraftMaid’s active and discontinued database before quoting.
Rowan Construction Group Redwood City is an independent contractor, not affiliated with KraftMaid. We source through authorized distributors and maintain our own sample and specification library.
Signs Your KraftMaid Home Additions & ADU Is Failing

- Permit rejection due to finish mismatch. Redwood City’s planning department requires visual consistency between primary dwellings and ADUs in historic overlay districts. If your existing KraftMaid cabinets are a discontinued finish like Vintage Onyx or pre-2019 Dove White, the city may flag the difference. We spot this during pre-application review and source close matches from KraftMaid’s current line or specify complementary contrast finishes that satisfy code.
- Drawer box delamination in unconditioned ADUs. Particleboard drawer sides swell at the dovetail joints when humidity stays above 70 percent, which happens in Redwood City ADUs during the rainy season before HVAC is operational. The drawer binds, then the bottom panel drops out. We specify all-plywood drawer boxes with dovetail joinery for ADU work - it’s a $200-$400 upcharge per cabinet that prevents a $2,000 replacement two years later.
- Soft-close hinge failure after 18-24 months. KraftMaid’s standard Blumotion hinges are rated for 80,000 cycles, but salt air from the bay accelerates corrosion on the hydraulic cylinder. In Redwood City properties west of El Camino Real, we see premature failure compared to inland Belmont or San Carlos. The symptom is a slam or a squeak, not a complete separation. We stock replacement Blum 71B3550 hinges and can swap a full kitchen’s worth in a morning.
- Wall cabinet sag in long-span additions. KraftMaid’s standard 30-inch wall cabinet is built for 16-inch stud spacing. In open-concept additions where designers spec 36-inch or 42-inch widths for visual impact, the back panel flexes if the installer didn’t add blocking. The doors go out of square and the shelf pins pop loose. We check for proper blocking during rough inspection and upgrade to reinforced back panels on spans over 32 inches.
- Corner cabinet blind reach hardware binding. The LeMans or Magic Corner pull-out systems in KraftMaid’s base corner units use polymer trays that warp slightly in the first summer of direct sun exposure. In south-facing Redwood City additions, this shows up as a tray that doesn’t fully retract or a support post that clicks. We stock replacement trays and can convert problematic corners to lazy Susan or diagonal wall cabinet configurations during the design phase.
Before
AfterReplacement Cost & What’s Included
Home additions and ADUs using KraftMaid cabinets in Redwood City fall into the $45,000-$130,000 range for the full project, with cabinet packages typically representing 25-35 percent of that total. A standalone ADU kitchen with 12-16 KraftMaid base and wall cabinets, island, and pantry runs $22,000-$45,000 for cabinets alone; an attached addition extending an existing kitchen runs $14,000-$28,000 for the incremental cabinetry.
What drives the range:
- Construction type: All-Plywood Construction adds 15-20 percent over Vantage particleboard.
- Door style and finish: Painted finishes cost more than stained; glazed and distressed treatments add 25-35 percent.
- Customization: Non-standard depths for compact ADUs, appliance panels for integrated refrigeration, and modified heights for eight-foot ceilings in new construction.
- Hardware tier: Standard Blumotion versus upgraded Servo-Drive electric opening.
Every quote from Rowan Construction Group Redwood City is a flat written price with line-item breakdown - cabinets, installation, trim, and finishing - delivered before any work starts. Under Clause 1 of the Haven Standard, that price does not change without a signed change order. Our 365-Day Done Right Promise covers installation and workmanship; KraftMaid’s limited lifetime warranty covers manufacturing defects on the cabinets themselves.
DIY or Call Us?

There’s safe checking, and then there’s work that needs a crew.
What you can verify yourself: confirm your existing KraftMaid model code from the interior label, measure your available cabinet run (width, depth, height to ceiling), and photograph any damage or wear patterns. Check Redwood City’s ADU handbook online for finish requirements in your zoning district - the city publishes this, and it’s free.
Where DIY goes wrong: cabinet installation demands laser-level precision - 1/8 inch out of level across a ten-foot run and your countertops won’t seat. In Redwood City’s older neighborhoods like Stambaugh-Heller, walls are not square and floors have settled; we come in with scribe tools, filler strips, and the experience of leveling 4,000-plus kitchens. Wall cabinet mounting into uncertain stud locations is genuinely dangerous without proper blocking and a second set of hands. We’ve been called to jobs where a homeowner’s self-installed 36-inch wall cabinet pulled out of drywall anchors - no injuries, but $800 in cabinet and wall repair.
Measure twice, document once, build it so it doesn’t come back. That’s how Grant Rowan runs every crew.
Call (650) 560-7228 to schedule your free estimate. We’ll bring the KraftMaid sample kit, check your existing cabinet codes against the database, and deliver a written price before anyone picks up a tool.
FAQs
Properly installed all-plywood KraftMaid cabinets last 20-30 years in Redwood City’s climate, though the marine air west of El Camino Real accelerates hinge corrosion and may require hardware replacement at year 10-15. Particleboard construction in unconditioned ADUs often shows swelling at 5-8 years. Call (650) 560-7228 for an exact quote on upgrading to plywood construction - estimates are free.
Individual components - hinges, drawer boxes, shelf pins, and door fronts - can be replaced if the cabinet case is intact and the finish is still available. If your cabinets are pre-2015 with a discontinued finish, repair becomes impractical because matching is impossible. We assess this during our site visit and tell you straight whether repair or replacement makes sense. Call (650) 560-7228 to schedule.
Removal of existing cabinets and installation of 12-16 new KraftMaid units takes 3-5 working days for a typical addition kitchen, assuming countertops are templated separately. ADU installations are faster - 2-3 days - because there’s no existing cabinetry to remove and dispose of. Full project timeline including KraftMaid’s 3-4 week factory lead time runs 6-10 weeks from signed contract to final punch. Call (650) 560-7228 for a written timeline with your quote.
KraftMaid is built-to-order from the Ohio factory - no dealer stocks complete kitchens. We maintain a sample library and specification binder in our Redwood City office, plus common hardware (hinges, drawer slides, shelf pins) on our installation trucks. For emergency repairs, we can often source compatible Blum hardware same-day from Bay Area suppliers even when the exact KraftMaid-branded part is factory-only. Call (650) 560-7228 and we’ll check availability against your model code.
Written by Grant Rowan, Owner, Rowan Construction Group Redwood City at Rowan Construction Group Redwood City, serving Redwood City and nearby areas.







Before
After
Before
After
Before
After